CASE STUDIES

ND-Exterior

Modular School Addition

To create this necessary space, the IMS team built a single story, 13- module addition that was connected to the existing building with an enclosed connector. 
JRLA Exterior

Modular Classroom Addition

The IMS team built a single story modular addition that consists of a brick exterior and steel siding along with oak trim detailing on the interior to allow the space to blend seamlessly. 
Exterior

Montessori School

Modular construction allowed the school to avoid delays and meet their timeline to open the business in conjunction with the surrounding public school calendars.
Dubois

Charter School Phased Construction

The overall project design then went through multiple iterations, with a budget that was both driven by the anticipated student count and limited due to a site that required significant grading work to become suitable for use as an educational facility.
Ashland_Exterior

Cosmetology School Building

The Ashland Community and Technical College (ACTC) cosmetology program was operating in an aging facility and desired to relocate the program to an upgraded location.
Mundelein_Exterior_exterior

Washington Early Learning Center

When the district analyzed and saw they could build a corridor rather inexpensively to connect the existing school to a modular classroom building, they decided it would alleviate parent’s concerns about safety and teacher’s concerns about lost construction time.
Main Photo

Head Start Education Projects

IMS has been involved with many Head Start programs; this case study lists three different Head Starts and their floor plans!
LNB-Exterior-Front

Daycare Facility

In 2009, a preschool in Nashville was opened to replace a daycare facility that was closed by the State of Tennessee for repeated non-compliance.