Green Dot contacted IMS with a concept for a three phase approach for starting a new high school in Memphis, Tennessee. In 2017 [9] classrooms were installed for Phase I and then an additional [10] classrooms in 2018 for Phase II-at Bluff City High school. With enrollment continuing to grow, an additional [16] classrooms were installed  during Phase III in 2019.

Phase I and II are connected buildings, while Phase III is connected with aluminum canopies and walkways for easy and efficient pass-through.

Highlights 

•   Admin Room/16 classrooms/teacher resource rooms
•   Ceramic tile in restrooms (floor and walls)
•   Entries have raised coin rubber flooring
•   11’ wide corridors
•   Fully painted drywall/gypsum
•   Rigid corner guards
•   8’6” Ceiling height in the classrooms
•   Restrooms: Touch free Kohler/Delta plumbing fixtures 
•   Occupancy sensors for all rooms for energy efficiency
•   White boards and tack boards in classrooms 

FLOOR PLAN

Click image to view full-size.

With enrollment continuing to grow, an additional [16] classrooms were installed  during Phase III in 2019.