CASE STUDIES

Waste Management

Scale House

Modular construction proved to be an effective solution because it was designed, built, delivered and installed in approximately 2 months.
TBLA-Exterior-21

Jr High/ High School Campus

The design utilized individual wings for the middle and high schools, which were connected and separated by a central core of common shared services such as the media-center, science laboratories, art rooms, and cafeteria.
ANK-Exterior

Magnet School for the Arts

The modular building includes classrooms for Art, Science, Social Studies, Music, Theater and Band along with mechanical rooms, technology rooms and restrooms.
Exterior_1

Detroit Middle School Campus

The IMS team constructed a 2-story modular addition, connected to the existing building with an enclosed corridor, to serve as the school’s educational wing. The building was installed and secured in 7 days.
CCA-1B-Exterior2

Middle School Campus

Cesar Chavez Academy, a public school academy located in Detroit, Michigan, was founded on the idea that each student should have a safe, nurturing and respectful learning environment while maintaining high standards allowing each student to reach their academic and social potential
ND-Exterior

Modular School Addition

To create this necessary space, the IMS team built a single story, 13- module addition that was connected to the existing building with an enclosed connector. 
JRLA Exterior

Modular Classroom Addition

The IMS team built a single story modular addition that consists of a brick exterior and steel siding along with oak trim detailing on the interior to allow the space to blend seamlessly. 
Exterior

Montessori School

Modular construction allowed the school to avoid delays and meet their timeline to open the business in conjunction with the surrounding public school calendars.