CASE STUDIES

featured-Winthrop

Level One Trauma Center

Winthrop-University Hospital was looking to add a Level One Trauma Center to the emergency department that would be able to treat both children and adult trauma patients.
Minot-featured

Minot School District

The District, working cooperatively with FEMA, turned to Kraus Anderson Construction Company (KA) of Minneapolis, Minnesota to assist with flood recovery efforts, both temporary and long-term.
Mashpee Dental Clinic

Mashpee Dental Clinic

The Mashpee Wampanoag Tribe was in need of a dental facility to serve the tribe that could also be easily relocated to a permanent location in the future.
featured-MRI

Claremore MRI Addition

With the addition of a Modular Imaging Suite to the Innovative Modular Solutions GSA contract, IMS was able to win a government contract with Indian Health Service in Claremore, Oklahoma.
Front of the building

Temporary Modular Campus

In June of 2016, a disastrous flood hit the county of Kanawha; Elkview, West Virginia and surrounding areas. The flooding was a result of massive rains, falling more than 10 inches in a 24 hour period.
Main Photo

Head Start Education Projects

IMS has been involved with many Head Start programs; this case study lists three different Head Starts and their floor plans!
Locker room featured image

Locker Room

An Innovative Modular Solutions’ client, with a stellar safety record and documented safety protocol was looking to provide their plant staff a more modern shower/locker room environment and break area.
Wellspan-Exterior

Wellspan Case Study

Wellspan Health & Surgery Center required the addition of an MRI unit to their existing facility. Originally, Wellspan was looking to add a mobile imaging trailer to fulfill their need.