Case Studies
Please click
here to contact us
Public
School District |
| 
|
Challenge:
Without a building or construction levy passed by voters since 1964, and
with continuous enrollment growth, 260 students in a Ohio School District
were being involuntarily bused to schools outside their neighborhoods
at a cost of $40,000 per year. In addition, school officials believed
that some parents and students were leaving the district due to overcrowding.
The district and its architect worked to determine the best solution for
students and staff. A plan was proposed that would add 8 new Classrooms
at the elementary school where neighborhood children had been bused to
other schools for the past 6 years. Each new Classroom would support 25
to 27 students and be wired for technology to include computers and the
public address system.
Alternatives Reviewed:
|
- Do nothing due to budget constraints — not feasible as overcrowding
impacted the educational outcome for students.
- Construct a traditional, site built building addition — not
feasible due to lack of funding and the time required for site built
construction. There was an immediate need for additional Classroom space.
- Install four 2-Classroom buildings or eight 1-Classroom buildings—
not feasible due to limited school ground space and 30 - 40% higher
temporary construction costs to connect site utilities and technology
for 4 to 8 separate structures.
- Install one 8-Classroom, modular building — the Innovative
Modular Solution.
Solution:
Public bids were solicited and the District contracted with Innovative
Modular Solutions (IMS). IMS provided an energy-efficient, 8,600 square
foot modular building that includes 8 climate controlled, 28’ x
30’ Classrooms, separate restroom areas for boys, girls and teachers
and a wet area for use by custodians. Construction was
completed during the summer. Students occupied the building in time for
the beginning of Fall semester. |
- Most students in the district can now attend their home schools. Parental
satisfaction is improved.
- Transportation cost savings transferred into the general fund for
other improvements to education in the district.
- The need for additional permanent space remains at many of the other
schools in the district. The modular Classrooms, however, ease the crowding
and help improve education for the next four to five years.
|
| |
| The information contained herein
is proprietary to Innovative Modular Solutions and may not be used, reproduced,
or disseminated without written consent. |
| |
 |
 |
 |
| |
297 E. South Frontage Rd, Unit B
Bolingbrook, IL 60440
Phone: 1-800-357-4699/1-630-972-0500
Fax: 1-630-972-0555 |
| Modular classrooms, mobile office space, modular medical facilities and other specialty modular buildings in IA, IL, KY, MI, MN, OH, PA, VA, WI, WV and Northeast U.S. Temporary and portable classrooms or permanent modular schools – IMS products are available for lease or sale. IMS has offices in IL, MI, IN, MN, OH and representatives located throughout the Midwest who are ready and anxious to assist you with your building needs! Call us soon! |
|